Townhouse - Bondi

Location: Multi-Area Installation

Project Duration: 14 Days

Project Background

This residential project involved comprehensive tiling across several key areas, including the balcony, main entrance, bathroom, and kitchen.

Challenges Faced

The absence of a staircase to the second floor created logistical difficulties in transporting tools, tiles, and materials to the upper level.

Solution & Result

To overcome this challenge, a conveyor belt system was installed, and additional manpower was allocated to streamline material handling. As a result, the project was completed on schedule, and our high-quality tiling workmanship left the client highly satisfied.